Support Login | Register    

<< Back    VISUAL|job for Control-M - Workload Analysis

With its workload analysis capabilities VISUALjob for Control-M answers the following questions for you:

  • How did certain jobs perform on a certain date?
  • What was the impact of certain jobs on the batch flow and batch window?
  • What trends can I identify in my batch window?
  • How can I optimize my batch flow?
  • Within the GANTTview all jobs are shown against a timeline and in relation to each other, allowing you to see exactly have they affected each other for a specific production run. Timelines indicate a jobs run and that jobs average runtime, allowing you to have an immediate comparison.

    (Click to view images)
    vClick to view images
    When calculating and displaying average run times in the GANTTView, VISUALjob for Control-M allows for the use of different statistical models, based upon the different type of production runs. For example; average run times differ between month end, quarterly and daily production runs.

    Histograms showing the number of jobs running in parallel and the average CPU consumption provide a complete picture, which is otherwise difficult, if not impossible, to gain. Bottle-necks and other potential problem areas can be identified and the required actions to avoid these problems can be made in a proactive way.

    Contact us for a free 30 day trial or a live presentation of our solutions
        Legal Notice  |  Imprint  |  Site Map

    Copyright © 2008 APS|ENTERprise software consulting gmbh (Germany). All rights reserved.